2010 Georgia Code 25-9-4 Case Law
Home
Menu


Jacksonville Attorney
Graham W. Syfert, Esq.

1650 Margaret St, Ste. 302, PMB#264
Jacksonville, FL 32204


Phone: 904-383-7448
E-mail: graham@syfert.com
Fax: 904-638-4726

Enter Code Number:
16-14-4 or 16-13-32

One Click Case Law for § 25-9-4
O.C.G.A. § 25-9-3 <-- --> O.C.G.A. §25-9-5



2010 Georgia Code

TITLE 25 - FIRE PROTECTION AND SAFETY

CHAPTER 9 - BLASTING OR EXCAVATING NEAR UTILITY FACILITIES
§ 25-9-4 - Design locate request and response

O.C.G.A. 25-9-4 (2010)
25-9-4. Design locate request and response


(a) Any person may submit a design locate request to the UPC. Such design locate request shall:

(1) Describe the tract or parcel of land for which the design locate request has been submitted with sufficient particularity, as defined by policies developed and promulgated by the UPC, to enable the facility owner or operator to ascertain the precise tract or parcel of land involved; and

(2) State the name, address, and telephone number of the person who has submitted the design locate request, as well as the name, address, and telephone number of any other person authorized to review any records subject to inspection as provided in paragraph (3) of subsection (b) of this Code section.

(b) Within ten working days after a design locate request has been submitted to the UPC for a proposed project, the facility owner or operator shall respond by one of the following methods:

(1) Designate or cause to be designated by a locator in accordance with Code Section 25-9-9 the location of all utility facilities and sewer laterals within the area of the proposed excavation;

(2) Provide to the person submitting the design locate request the best available description of all utility facilities and sewer laterals in the area of proposed excavation, which might include drawings of utility facilities and sewer laterals already built in the area, or other facility records that are maintained by the facility owner or operator; or

(3) Allow the person submitting the design locate request or any other authorized person to inspect or copy the drawings or other records for all utility facilities and sewer laterals within the proposed area of excavation.

(c) Upon responding using any of the methods provided in subsection (b) of this Code section, the facility owner or operator shall provide the response to the UPC in accordance with UPC procedures.

Georgia Caselaw Research

Google Scholar

Graham Syfert - Jacksonville Lawyer

Home * About Graham Syfert * Contact Us * Map and Location
Graham's Personal Blog


Graham W. Syfert, Esq., P.A.
Phone: 904-383-7448
Fax: 904-638-4726

graham@syfert.com